We generally require 2-3 weeks from the time you decide to go ahead with us, to the installation day. This can sometimes be shorter and we can be flexible as well, if you require a longer time frame.

The average home on the Sunshine Coast will install between 3- 5kW of solar panels. It usually takes between half a day to and 1 day to install do a thorough installation of 5kW. We would generally only need around 1 hour to access internal roof space.
Panels need to be cleaned every 3-6 months to keep maximum efficiency. You can lose up to 5% efficiency if they are not clean. If you wish you can clean them yourself or contact us for more options.
The typical Solar Industry standard is a 10-12 year manufacturer’s warranty.

There is also a performance guarantee that states that the panels will perform up to 90% of their maximum efficiency for the first 10 years and then to a minimum of 80% efficiency for the first 25 years.

We offer a 10 year guarantee on our installations.